Gadish was chosen to manage the execution of the first toll road in Israel to be managed by a private developer – Derech Eretz Highways, in a B.O.T. format. The length of this road segment is 28 kilometers and it includes 6 interchanges, 29 bridges and culverts which were executed in various methods, and two 18-meter-wide tunnels with a total length of 910 meters
Unique cutting-edge control and command systems were installed in the road, and they are connected to the road’s control center in the Nahshonim Interchange. Gadish was chosen to manage the execution of the road, including coordinating the works with dozens of subcontractors which worked simultaneously in the field, and supervising the project’s quality control
- Service: Execution management
- Customer: Derech Eretz Highways
- Financial Scope: about $670 million
- Status: Completed